Job Details

How did you come to know vacancy :

Apply State For

Request for Quotation from Agencies / individual to Evaluate rejuvenation of 5 ponds in Noida

Request for Quotation from Agencies / individual to Evaluate rejuvenation of 5 ponds in Noida

 

EOI

Request for Quotation from Agencies / individual to Evaluate rejuvenation of 5 ponds in Noida

Project Title

Rejuvenation of five ponds in Gautam Budha Nagar district, Noida

Backgroound

ActionAid Association is an Indian social organisation and part of global federation working together to defeat poverty and injustice with a tag line –Unite for equality and justice. 

 

Actionaid with the support from HCL have identified 5 ponds for rejuvenation in Beel Akbarpur and Kot village in Dadri (Gautam Budh Nagar).

 

The pond rejuvenation work has been done as per the below parameter

  • Desilting/ Excavation of ponds: The desilting /excavating will be done through JCBs machines and the excavated silt will be either transported to a far off place or if there is need to strengthen the bunding it will be used there only.
  • Clearing grass and removal of the rubbish up to 50 meters outside the periphery of the ponds will be cleared.
  • For water inlet & outlet non-pressure NP2 class RCC pipes with collars will be put up.
  • For horticulture development sludge and manure would be transported and spread around the outer perimeter of the pond

 

Other parameters:

1.       Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5cm also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

2.       Clearing grass and removal of the rubbish up to a distance of 50 mtr outside the periphery of the area cleared.

3.       PCC: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

4.       CENTRING SHUTERRING: Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns:

Assignment details

Evaluation as per the detailed architectural, engineering, designs, value of money and specifications for all structures that are proposed in the project proposal and Agreement with the contractor.

 

Water storage capacity enhanced

 

Nature of Job

Research, Data Analysation  & Report writing

Timeline

The compilation / Study expected to complete within 2 months from the beginning of the consultancy.

Job Location

Delhi

Summary of Deliverables:

Share the draft reports (in English) by incorporating data and narrative information, as well as the feedback on the draft if any

The final evaluation report should basically include the following points:

  • Acknowledgements –
  • Glossary/Acronyms –
  • Introduction –
  • Executive Summary –
  • Methodology –
  • Pond wise evaluation details
  • Limitation –
  • Conclusion -
  • Appendices

Travel

Consultant need to travel to Kot and Beel Akbarpur village for evaluation and verification

Skills and competencies

Experience of evaluation of ecological project, understanding of architectural, engineering, designspond. 

 

Consultancy Fee Offered

Rs. 80,000 approx. including travel and other expanses to compile the report (Taxes as applicable )

To apply

The consultant/agency will have to submit only relevant work experience and resume of key member / team members to recruitment.india@actionaid.org . ActionAid Association will shortlist the consultant/agency and will call for discussion and will finalize the consultant/agency for the proposed action.

 

 

Share the draft reports (in English) by incorporating data and narrative information, as well as the feedback on the draft if any

The final evaluation report should basically include the following points:

  • Acknowledgements –
  • Glossary/Acronyms –
  • Introduction –
  • Executive Summary –
  • Methodology –
  • Pond wise evaluation details
  • Limitation –
  • Conclusion -
  • Appendices